{"id":279545,"date":"2022-08-26T08:18:24","date_gmt":"2022-08-26T03:18:24","guid":{"rendered":"https:\/\/leadpakistan.com.pk\/news\/?p=279545"},"modified":"2022-08-26T08:18:24","modified_gmt":"2022-08-26T03:18:24","slug":"ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2","status":"publish","type":"post","link":"https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/","title":{"rendered":"NTDC Submits System Operator Licence Application to NEPRA &#8211; A Giant Leap Forward for the Power Sector of Pakistan"},"content":{"rendered":"<p> Islamabad<br \/>\nIn a major development, Deputy Managing Director (P&#038;E), National Transmission and Despatch Company (NTDC) called on Chairman NEPRA, Mr. Tauseef H. Farooqi at NEPRA HQ, Islamabad this morning to submit the System Operator (SO) Licence application along with the draft Grid Code, on behalf of NTDC. Mr. Farooqi appreciated the untiring efforts of the NTDC team in preparation of the Grid Code and remarked that this was a fulfilment of the vision laid down by the WAPDA Restructuring Plan 1992.<br \/>\nThe submission marks a major milestone in the Competitive Trading Bilateral Contract Market (CTBCM) institutional reforms undertaken, envisioned as a critical action item under the CTBCM implementation roadmap approved by the Authority in November 2020.<br \/>\nThe system operator will be responsible for operations, centralized scheduling and despatch of power plants connected to the National Grid. The independence of the system operator will positively usher in cutting edge technology and modern techniques to ensure the transparent and efficient operations and economic despatch along-with effective long-term system planning of power sector of Pakistan.<br \/>\nAfter input from local and international consultants, the first draft of the new Grid Code was shared with NEPRA at the end of last year.<br \/>\nSince then, NEPRA professionals worked tirelessly and engaged in numerous detailed consultative sessions with the NTDC team and local stakeholders to align the new Grid Code with the evolving face of the power sector in the light of CTBCM reforms.<br \/>\nThe Grid Code 2022, once approved, will supersede the existing Grid Code 2005. It addresses the technological developments in the electric power business, including renewable energy power plants and HVDC.<br \/>\nThe Grid Code sets out the guidelines, rules and procedures to be adopted by all stakeholders of the power sector. It is structured to ensure the development and operation of the National Grid in an efficient, safe, reliable, and co-ordinated manner.<br \/>\nNEPRA acknowledges the efforts of the NTDC and all other stakeholders that were a part of the development of the SO licence application and the draft Grid Code for achieving the ultimate re-structuring of NTDC as part of the institutional reforms envisaged under CTBCM. Moving forward, NEPRA will process the SO licence application along with the draft Grid Code in accordance with the applicable regulatory framework.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad In a major development, Deputy Managing Director (P&#038;E), National Transmission and Despatch Company (NTDC) called on Chairman NEPRA, Mr. Tauseef H. Farooqi at NEPRA HQ, Islamabad this morning to submit the System Operator (SO) Licence application along with the draft Grid Code, on behalf of NTDC. Mr. Farooqi appreciated the untiring efforts of the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":279490,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":{"0":"post-279545","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-national"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>NTDC Submits System Operator Licence Application to NEPRA - A Giant Leap Forward for the Power Sector of Pakistan<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"NTDC Submits System Operator Licence Application to NEPRA - A Giant Leap Forward for the Power Sector of Pakistan\" \/>\n<meta property=\"og:description\" content=\"Islamabad In a major development, Deputy Managing Director (P&#038;E), National Transmission and Despatch Company (NTDC) called on Chairman NEPRA, Mr. Tauseef H. Farooqi at NEPRA HQ, Islamabad this morning to submit the System Operator (SO) Licence application along with the draft Grid Code, on behalf of NTDC. Mr. Farooqi appreciated the untiring efforts of the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Daily Lead Pakistan\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DailyLeadPak\/\" \/>\n<meta property=\"article:published_time\" content=\"2022-08-26T03:18:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2022\/08\/IMG-20220825-WA0049.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"853\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Web Desk\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@DailyLeadPak\" \/>\n<meta name=\"twitter:site\" content=\"@DailyLeadPak\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Web Desk\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\\\/\"},\"author\":{\"name\":\"Web Desk\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#\\\/schema\\\/person\\\/6ef8309590ff620a99ce35559f54fd62\"},\"headline\":\"NTDC Submits System Operator Licence Application to NEPRA &#8211; A Giant Leap Forward for the Power Sector of Pakistan\",\"datePublished\":\"2022-08-26T03:18:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\\\/\"},\"wordCount\":390,\"publisher\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/IMG-20220825-WA0049.jpg\",\"articleSection\":[\"National\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\\\/\",\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\\\/\",\"name\":\"NTDC Submits System Operator Licence Application to NEPRA - A Giant Leap Forward for the Power Sector of Pakistan\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/IMG-20220825-WA0049.jpg\",\"datePublished\":\"2022-08-26T03:18:24+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\\\/#primaryimage\",\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/IMG-20220825-WA0049.jpg\",\"contentUrl\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/IMG-20220825-WA0049.jpg\",\"width\":1280,\"height\":853},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"NTDC Submits System Operator Licence Application to NEPRA &#8211; A Giant Leap Forward for the Power Sector of Pakistan\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/\",\"name\":\"Daily Lead Pakistan\",\"description\":\"Daily Lead Pakistan\",\"publisher\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#organization\",\"name\":\"Daily lead Pakistan\",\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/logo3.jpg\",\"contentUrl\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/logo3.jpg\",\"width\":1000,\"height\":154,\"caption\":\"Daily lead Pakistan\"},\"image\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DailyLeadPak\\\/\",\"https:\\\/\\\/x.com\\\/DailyLeadPak\",\"https:\\\/\\\/instagram.com\\\/DailyLeadPak\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#\\\/schema\\\/person\\\/6ef8309590ff620a99ce35559f54fd62\",\"name\":\"Web Desk\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g\",\"caption\":\"Web Desk\"},\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/author\\\/edt\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"NTDC Submits System Operator Licence Application to NEPRA - A Giant Leap Forward for the Power Sector of Pakistan","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/","og_locale":"en_US","og_type":"article","og_title":"NTDC Submits System Operator Licence Application to NEPRA - A Giant Leap Forward for the Power Sector of Pakistan","og_description":"Islamabad In a major development, Deputy Managing Director (P&#038;E), National Transmission and Despatch Company (NTDC) called on Chairman NEPRA, Mr. Tauseef H. Farooqi at NEPRA HQ, Islamabad this morning to submit the System Operator (SO) Licence application along with the draft Grid Code, on behalf of NTDC. Mr. Farooqi appreciated the untiring efforts of the [&hellip;]","og_url":"https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/","og_site_name":"Daily Lead Pakistan","article_publisher":"https:\/\/www.facebook.com\/DailyLeadPak\/","article_published_time":"2022-08-26T03:18:24+00:00","og_image":[{"width":1280,"height":853,"url":"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2022\/08\/IMG-20220825-WA0049.jpg","type":"image\/jpeg"}],"author":"Web Desk","twitter_card":"summary_large_image","twitter_creator":"@DailyLeadPak","twitter_site":"@DailyLeadPak","twitter_misc":{"Written by":"Web Desk","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/#article","isPartOf":{"@id":"https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/"},"author":{"name":"Web Desk","@id":"https:\/\/leadpakistan.com.pk\/news\/#\/schema\/person\/6ef8309590ff620a99ce35559f54fd62"},"headline":"NTDC Submits System Operator Licence Application to NEPRA &#8211; A Giant Leap Forward for the Power Sector of Pakistan","datePublished":"2022-08-26T03:18:24+00:00","mainEntityOfPage":{"@id":"https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/"},"wordCount":390,"publisher":{"@id":"https:\/\/leadpakistan.com.pk\/news\/#organization"},"image":{"@id":"https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/#primaryimage"},"thumbnailUrl":"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2022\/08\/IMG-20220825-WA0049.jpg","articleSection":["National"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/","url":"https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/","name":"NTDC Submits System Operator Licence Application to NEPRA - A Giant Leap Forward for the Power Sector of Pakistan","isPartOf":{"@id":"https:\/\/leadpakistan.com.pk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/#primaryimage"},"image":{"@id":"https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/#primaryimage"},"thumbnailUrl":"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2022\/08\/IMG-20220825-WA0049.jpg","datePublished":"2022-08-26T03:18:24+00:00","breadcrumb":{"@id":"https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/#primaryimage","url":"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2022\/08\/IMG-20220825-WA0049.jpg","contentUrl":"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2022\/08\/IMG-20220825-WA0049.jpg","width":1280,"height":853},{"@type":"BreadcrumbList","@id":"https:\/\/leadpakistan.com.pk\/news\/ntdc-submits-system-operator-licence-application-to-nepra-a-giant-leap-forward-for-the-power-sector-of-pakistan-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/leadpakistan.com.pk\/news\/"},{"@type":"ListItem","position":2,"name":"NTDC Submits System Operator Licence Application to NEPRA &#8211; A Giant Leap Forward for the Power Sector of Pakistan"}]},{"@type":"WebSite","@id":"https:\/\/leadpakistan.com.pk\/news\/#website","url":"https:\/\/leadpakistan.com.pk\/news\/","name":"Daily Lead Pakistan","description":"Daily Lead Pakistan","publisher":{"@id":"https:\/\/leadpakistan.com.pk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/leadpakistan.com.pk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/leadpakistan.com.pk\/news\/#organization","name":"Daily lead Pakistan","url":"https:\/\/leadpakistan.com.pk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/leadpakistan.com.pk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2022\/04\/logo3.jpg","contentUrl":"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2022\/04\/logo3.jpg","width":1000,"height":154,"caption":"Daily lead Pakistan"},"image":{"@id":"https:\/\/leadpakistan.com.pk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DailyLeadPak\/","https:\/\/x.com\/DailyLeadPak","https:\/\/instagram.com\/DailyLeadPak\/"]},{"@type":"Person","@id":"https:\/\/leadpakistan.com.pk\/news\/#\/schema\/person\/6ef8309590ff620a99ce35559f54fd62","name":"Web Desk","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g","caption":"Web Desk"},"url":"https:\/\/leadpakistan.com.pk\/news\/author\/edt\/"}]}},"_links":{"self":[{"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/posts\/279545","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/comments?post=279545"}],"version-history":[{"count":1,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/posts\/279545\/revisions"}],"predecessor-version":[{"id":279581,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/posts\/279545\/revisions\/279581"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/media\/279490"}],"wp:attachment":[{"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/media?parent=279545"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/categories?post=279545"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/tags?post=279545"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}