{"id":436190,"date":"2024-10-09T08:17:37","date_gmt":"2024-10-09T03:17:37","guid":{"rendered":"https:\/\/leadpakistan.com.pk\/news\/?p=436190"},"modified":"2024-10-09T08:17:37","modified_gmt":"2024-10-09T03:17:37","slug":"southern-link-road-a-troubling-development-in-peshawar-valleys-future","status":"publish","type":"post","link":"https:\/\/leadpakistan.com.pk\/news\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\/","title":{"rendered":"Southern link road: a troubling development in Peshawar Valley\u2019s future"},"content":{"rendered":"<p>Engr. Imad Ahmad <\/p>\n<p>The Southern Link Road, a highly anticipated infrastructure project in the Peshawar Valley, is rapidly emerging as a developmental misstep with potentially disastrous consequences. Stretching for about 42 kilometers, this two-lane corridor is designed to connect the National Highway (GT Road) to the historic Khyber Pass at Torkham via Bara Bazar. As a part of the broader Khyber Pass Economic Corridor (KPEC) project, which is financed by the World Bank, the road aims to enhance trade between Pakistan and Afghanistan and further the objectives of the China-Pakistan Economic Corridor (CPEC) and the One Belt One Road (OBOR) initiative. Despite these ambitious goals, the Southern Link Road is marred by significant flaws in its scope, design, and implementation, raising grave concerns about its environmental, cultural, and economic impact.<br \/>\nOne of the most pressing concerns is the potential environmental degradation that the Southern Link Road could cause in the Peshawar Valley. This region is renowned for its fertile agricultural land, which supports the livelihoods of thousands of farmers. The road\u2019s alignment cuts through nearly 2,500 acres of prime agricultural land across eight villages, including Mashokhel, Mashogagar, Badabher, Ghari Malehkhel, Mushtarzai, and Sheikhan. The destruction of this farmland could lead to a substantial reduction in local food production, directly impacting food security and the regional economy. According to estimates, the project could result in the loss of up to 30% of the agricultural output from these villages, a blow that would resonate throughout the local economy.<br \/>\nBeyond the immediate threat to agriculture, there are serious concerns about the long-term environmental impact of the road. The construction activities, including excavation, road paving, and the use of heavy machinery, are expected to lead to soil erosion, deforestation, and water pollution. The terrain of Badhaber and Sheikhan is home to a variety of plant and animal species, some of which are already under threat from rapid urbanization. Environmental studies suggest that the project could lead to a 15% reduction in the region\u2019s biodiversity, further endangering local ecosystems. Moreover, the road\u2019s proximity to agricultural areas raises the risk of chemical runoff from construction sites contaminating water sources, which could have severe consequences for both human and animal populations.<br \/>\nIn addition to environmental concerns, the Southern Link Road poses a significant threat to the cultural heritage of the Khalil Mohmand tribe, a prominent and historic tribe in the Peshawar region. The tribe\u2019s connection to the land spans centuries, and their cultural practices, traditions, and way of life are closely tied to the region\u2019s geography and environment. The road\u2019s alignment is set to disrupt areas of great cultural and historical significance to the Khalil Mohmand tribe, including their ancestral lands and sites that have been preserved for generations. The construction of the road threatens to erase these cultural landmarks, which would represent an irreparable loss to the tribe\u2019s heritage and identity. Local community leaders have expressed deep concern over the potential destruction of these sites, warning that it could lead to the erosion of the tribe\u2019s cultural fabric.<br \/>\nThe imposition of Section 4 of the Land Acquisition Act further exacerbates these concerns, as it allows the government to forcibly acquire land for public purposes, often without adequate compensation or consultation with affected communities. This has led to widespread anxiety among the residents of the affected villages, many of whom fear they will lose their homes and livelihoods. The imposition of Section 4 has advertently affected the fate of IDPS who have faced the wrath of militancy in 2008 and somehow they have found solace by migrating to these low-lying areas of Sheikhan and Badabher. Now displacing for the second time would account for nothing less than the extinction of these families.<br \/>\nMoreover, the project has sparked widespread discontent among local communities, who feel marginalized in the planning process. Despite the significant impact the road will have on their lives, many residents claim they were not adequately consulted or informed about the project\u2019s details. In a recent Kuli Kacheri organized by the district administration, it was found that over 70% of the affected population was unaware of the full scope of the project, leading to growing resentment and opposition. This lack of transparency has further fueled public speculation that the project is being pushed through without proper consideration of its social and cultural impact. The design and engineering of the Southern Link Road are also fraught with issues that could undermine its success. One of the most glaring problems is the road\u2019s alignment, which has been criticized for being vague and poorly planned. The current design seems to run over many houses, orchards, graveyards, and even mosques, raising doubts about whether a ground survey was ever conducted for its finalization or if it was merely chalked out on a Google map as part of a photographic survey. This lack of foresight could lead to unforeseen challenges during construction, driving up costs and causing delays.<br \/>\nThe economic and social consequences of the Southern Link Road are equally troubling. The acquisition of land for the project has already halted the sale purchase of land in the area, disrupting their livelihoods and exacerbating economic hardship in the region. The loss of agricultural land, estimated at over 2,500 acres, is expected to reduce local food production by nearly 30%, leading to higher food prices and increased poverty. The economic fallout could be severe, particularly for smallholder farmers who rely on this land for their survival. Moreover, the displacement of communities and the loss of cultural heritage could lead to social unrest, further destabilizing the region. Without a clear alignment with the broader goals of the KPEC project, the Southern Link Road risks becoming an expensive and ineffective infrastructure piece, creating more problems than it solves.<br \/>\nGiven these serious concerns, it is crucial to consider alternative approaches to the Southern Link Road project. One potential solution is to re-evaluate the road\u2019s alignment and design to minimize its impact on the environment and local communities. This could involve rerouting the road away from agricultural land and culturally significant areas, as well as implementing stringent environmental safeguards to protect local ecosystems. Additionally, there is a need for greater transparency and community engagement in the project\u2019s planning and implementation. By involving local communities in the decision-making process, the project can better address their concerns and ensure that their voices are heard. This would not only help to mitigate the negative impact of the road but also build trust and support among local stakeholders.<\/p>\n<p>The writer a Ph.D Scholar in UET Peahawar <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Engr. Imad Ahmad The Southern Link Road, a highly anticipated infrastructure project in the Peshawar Valley, is rapidly emerging as a developmental misstep with potentially disastrous consequences. Stretching for about 42 kilometers, this two-lane corridor is designed to connect the National Highway (GT Road) to the historic Khyber Pass at Torkham via Bara Bazar. As [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[13474],"class_list":["post-436190","post","type-post","status-publish","format-standard","category-article","tag-engr-imad-ahmad"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Southern link road: a troubling development in Peshawar Valley\u2019s future<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/leadpakistan.com.pk\/news\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Southern link road: a troubling development in Peshawar Valley\u2019s future\" \/>\n<meta property=\"og:description\" content=\"Engr. Imad Ahmad The Southern Link Road, a highly anticipated infrastructure project in the Peshawar Valley, is rapidly emerging as a developmental misstep with potentially disastrous consequences. Stretching for about 42 kilometers, this two-lane corridor is designed to connect the National Highway (GT Road) to the historic Khyber Pass at Torkham via Bara Bazar. As [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/leadpakistan.com.pk\/news\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\/\" \/>\n<meta property=\"og:site_name\" content=\"Daily Lead Pakistan\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DailyLeadPak\/\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-09T03:17:37+00:00\" \/>\n<meta name=\"author\" content=\"Web Desk\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@DailyLeadPak\" \/>\n<meta name=\"twitter:site\" content=\"@DailyLeadPak\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Web Desk\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\\\/\"},\"author\":{\"name\":\"Web Desk\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#\\\/schema\\\/person\\\/6ef8309590ff620a99ce35559f54fd62\"},\"headline\":\"Southern link road: a troubling development in Peshawar Valley\u2019s future\",\"datePublished\":\"2024-10-09T03:17:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\\\/\"},\"wordCount\":1100,\"publisher\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#organization\"},\"keywords\":[\"Engr. Imad Ahmad\"],\"articleSection\":[\"Article\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\\\/\",\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\\\/\",\"name\":\"Southern link road: a troubling development in Peshawar Valley\u2019s future\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#website\"},\"datePublished\":\"2024-10-09T03:17:37+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Southern link road: a troubling development in Peshawar Valley\u2019s future\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/\",\"name\":\"Daily Lead Pakistan\",\"description\":\"Daily Lead Pakistan\",\"publisher\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#organization\",\"name\":\"Daily lead Pakistan\",\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/logo3.jpg\",\"contentUrl\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/logo3.jpg\",\"width\":1000,\"height\":154,\"caption\":\"Daily lead Pakistan\"},\"image\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DailyLeadPak\\\/\",\"https:\\\/\\\/x.com\\\/DailyLeadPak\",\"https:\\\/\\\/instagram.com\\\/DailyLeadPak\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#\\\/schema\\\/person\\\/6ef8309590ff620a99ce35559f54fd62\",\"name\":\"Web Desk\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g\",\"caption\":\"Web Desk\"},\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/author\\\/edt\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Southern link road: a troubling development in Peshawar Valley\u2019s future","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/leadpakistan.com.pk\/news\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\/","og_locale":"en_US","og_type":"article","og_title":"Southern link road: a troubling development in Peshawar Valley\u2019s future","og_description":"Engr. Imad Ahmad The Southern Link Road, a highly anticipated infrastructure project in the Peshawar Valley, is rapidly emerging as a developmental misstep with potentially disastrous consequences. Stretching for about 42 kilometers, this two-lane corridor is designed to connect the National Highway (GT Road) to the historic Khyber Pass at Torkham via Bara Bazar. As [&hellip;]","og_url":"https:\/\/leadpakistan.com.pk\/news\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\/","og_site_name":"Daily Lead Pakistan","article_publisher":"https:\/\/www.facebook.com\/DailyLeadPak\/","article_published_time":"2024-10-09T03:17:37+00:00","author":"Web Desk","twitter_card":"summary_large_image","twitter_creator":"@DailyLeadPak","twitter_site":"@DailyLeadPak","twitter_misc":{"Written by":"Web Desk","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/leadpakistan.com.pk\/news\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\/#article","isPartOf":{"@id":"https:\/\/leadpakistan.com.pk\/news\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\/"},"author":{"name":"Web Desk","@id":"https:\/\/leadpakistan.com.pk\/news\/#\/schema\/person\/6ef8309590ff620a99ce35559f54fd62"},"headline":"Southern link road: a troubling development in Peshawar Valley\u2019s future","datePublished":"2024-10-09T03:17:37+00:00","mainEntityOfPage":{"@id":"https:\/\/leadpakistan.com.pk\/news\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\/"},"wordCount":1100,"publisher":{"@id":"https:\/\/leadpakistan.com.pk\/news\/#organization"},"keywords":["Engr. Imad Ahmad"],"articleSection":["Article"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/leadpakistan.com.pk\/news\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\/","url":"https:\/\/leadpakistan.com.pk\/news\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\/","name":"Southern link road: a troubling development in Peshawar Valley\u2019s future","isPartOf":{"@id":"https:\/\/leadpakistan.com.pk\/news\/#website"},"datePublished":"2024-10-09T03:17:37+00:00","breadcrumb":{"@id":"https:\/\/leadpakistan.com.pk\/news\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/leadpakistan.com.pk\/news\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/leadpakistan.com.pk\/news\/southern-link-road-a-troubling-development-in-peshawar-valleys-future\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/leadpakistan.com.pk\/news\/"},{"@type":"ListItem","position":2,"name":"Southern link road: a troubling development in Peshawar Valley\u2019s future"}]},{"@type":"WebSite","@id":"https:\/\/leadpakistan.com.pk\/news\/#website","url":"https:\/\/leadpakistan.com.pk\/news\/","name":"Daily Lead Pakistan","description":"Daily Lead Pakistan","publisher":{"@id":"https:\/\/leadpakistan.com.pk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/leadpakistan.com.pk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/leadpakistan.com.pk\/news\/#organization","name":"Daily lead Pakistan","url":"https:\/\/leadpakistan.com.pk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/leadpakistan.com.pk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2022\/04\/logo3.jpg","contentUrl":"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2022\/04\/logo3.jpg","width":1000,"height":154,"caption":"Daily lead Pakistan"},"image":{"@id":"https:\/\/leadpakistan.com.pk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DailyLeadPak\/","https:\/\/x.com\/DailyLeadPak","https:\/\/instagram.com\/DailyLeadPak\/"]},{"@type":"Person","@id":"https:\/\/leadpakistan.com.pk\/news\/#\/schema\/person\/6ef8309590ff620a99ce35559f54fd62","name":"Web Desk","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g","caption":"Web Desk"},"url":"https:\/\/leadpakistan.com.pk\/news\/author\/edt\/"}]}},"_links":{"self":[{"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/posts\/436190","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/comments?post=436190"}],"version-history":[{"count":1,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/posts\/436190\/revisions"}],"predecessor-version":[{"id":436203,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/posts\/436190\/revisions\/436203"}],"wp:attachment":[{"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/media?parent=436190"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/categories?post=436190"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/tags?post=436190"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}