{"id":576791,"date":"2026-11-10T06:30:14","date_gmt":"2026-11-10T01:30:14","guid":{"rendered":"https:\/\/leadpakistan.com.pk\/news\/?p=576791"},"modified":"2026-11-10T06:30:14","modified_gmt":"2026-11-10T01:30:14","slug":"water-enters-tarbela-powerhouse-after-rockfall","status":"publish","type":"post","link":"https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/","title":{"rendered":"Water enters Tarbela powerhouse after rockfall"},"content":{"rendered":"<p>Wapda says main tunnel, tail race culvert and switchyard remain undamaged<br \/>\n HARIPUR<br \/>\nA breach in a protective bund at the Tarbela Dam\u2019s T-5 hydropower project on Monday caused a large volume of water to flood Tunnel Five, prompting the suspension of construction work indefinitely, officials said.<br \/>\nAccording to a statement issued by the Water and Power Development Authority (WAPDA), during tunnel excavation of the 2nd Bench Connecting Tunnel, a weak rock mass collapsed, causing water from the Intake Pit to enter the Tunnel and the powerhouse area. \u201cThe water from the Intake Pit has been completely drained, and no further water is entering the downstream work sites,\u201d the statement said, adding that dewatering from the under-construction powerhouse had started.<br \/>\nThe authority informed that all workers were immediately evacuated safely following the incident, adding that no casualties had been reported.<br \/>\nWAPDA stated that senior officers, the engineer, and the contractor were assessing the situation to address any challenges to Project T-5. The statement also debunked information circulating about the collapse of the T-5 Tunnel: \u201cThere is no damage to the main Tunnel, under-construction powerhouse, tailrace culvert or switch yard. Reports of tunnel collapse are incorrect.\u201d<br \/>\nMeanwhile, Haripur Deputy Commissioner Waseem Ahmed earlier visited the site following the incident and confirmed that water had entered the tunnel after the protective bund gave way. He said the administration and rescue agencies had promptly evacuated all Pakistani and foreign workers to a safe location following the breach.<br \/>\nOne Pakistani worker was swept into the water as the tunnel flooded but was rescued by emergency teams, Ahmed said, adding that no casualties had been reported.<br \/>\nHe said that construction and development work on the T-5 project had been suspended indefinitely following the incident, while an investigation had been launched to determine the cause of the breach. Ahmed further added that a high-level inquiry would examine the circumstances surrounding the failure of the protective bund and establish whether a structural weakness or technical fault had caused it.<br \/>\n\u201cThe next course of action would be determined after the investigation report was received,\u201d he added.<br \/>\nThe construction work was part of the Tarbela 5th Extension Hydropower Project, a major WAPDA scheme being built at Tunnel No. 5 of Tarbela Dam. The project was intended to add 1,530 megawatts to the dam\u2019s installed generation capacity through three units of 510MW each.<br \/>\nWAPDA awarded a $354.6 million contract for the project\u2019s civil works to China\u2019s Power Construction Corporation of China Limited in May 2021. The project had an approved cost of $807 million, with the World Bank providing $390 million and the Asian Infrastructure Investment Bank contributing $300 million.<br \/>\nOnce completed, it was expected to generate an average of 1.347 billion units of electricity annually and increase Tarbela Dam\u2019s installed capacity from 4,888MW to 6,418MW.<br \/>\nThe project, however, has faced repeated delays, pushing its completion deadline back from the original five-year schedule to September 2027. In September 2024, a project director told a Senate committee that delays had been caused, among other factors, by difficulties in obtaining an NOC from the Indus River System Authority (IRSA) for the closure of Tunnel 5.<br \/>\nThe project had also faced a temporary suspension in August 2025 after rising reservoir levels and increased water inflows led to water entering the construction site.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Wapda says main tunnel, tail race culvert and switchyard remain undamaged HARIPUR A breach in a protective bund at the Tarbela Dam\u2019s T-5 hydropower project on Monday caused a large volume of water to flood Tunnel Five, prompting the suspension of construction work indefinitely, officials said. According to a statement issued by the Water and [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":576803,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-576791","post","type-post","status-publish","format-standard","has-post-thumbnail","category-top-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Water enters Tarbela powerhouse after rockfall<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Water enters Tarbela powerhouse after rockfall\" \/>\n<meta property=\"og:description\" content=\"Wapda says main tunnel, tail race culvert and switchyard remain undamaged HARIPUR A breach in a protective bund at the Tarbela Dam\u2019s T-5 hydropower project on Monday caused a large volume of water to flood Tunnel Five, prompting the suspension of construction work indefinitely, officials said. According to a statement issued by the Water and [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/\" \/>\n<meta property=\"og:site_name\" content=\"Daily Lead Pakistan\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DailyLeadPak\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-10T01:30:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2026\/11\/Front-Pesha-5.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1707\" \/>\n\t<meta property=\"og:image:height\" content=\"990\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Web Desk\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@DailyLeadPak\" \/>\n<meta name=\"twitter:site\" content=\"@DailyLeadPak\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Web Desk\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/water-enters-tarbela-powerhouse-after-rockfall\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/water-enters-tarbela-powerhouse-after-rockfall\\\/\"},\"author\":{\"name\":\"Web Desk\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#\\\/schema\\\/person\\\/6ef8309590ff620a99ce35559f54fd62\"},\"headline\":\"Water enters Tarbela powerhouse after rockfall\",\"datePublished\":\"2026-11-10T01:30:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/water-enters-tarbela-powerhouse-after-rockfall\\\/\"},\"wordCount\":547,\"publisher\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/water-enters-tarbela-powerhouse-after-rockfall\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Front-Pesha-5.jpg\",\"articleSection\":[\"Top News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/water-enters-tarbela-powerhouse-after-rockfall\\\/\",\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/water-enters-tarbela-powerhouse-after-rockfall\\\/\",\"name\":\"Water enters Tarbela powerhouse after rockfall\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/water-enters-tarbela-powerhouse-after-rockfall\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/water-enters-tarbela-powerhouse-after-rockfall\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Front-Pesha-5.jpg\",\"datePublished\":\"2026-11-10T01:30:14+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/water-enters-tarbela-powerhouse-after-rockfall\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/water-enters-tarbela-powerhouse-after-rockfall\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/water-enters-tarbela-powerhouse-after-rockfall\\\/#primaryimage\",\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Front-Pesha-5.jpg\",\"contentUrl\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Front-Pesha-5.jpg\",\"width\":1707,\"height\":990},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/water-enters-tarbela-powerhouse-after-rockfall\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Water enters Tarbela powerhouse after rockfall\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/\",\"name\":\"Daily Lead Pakistan\",\"description\":\"Daily Lead Pakistan\",\"publisher\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#organization\",\"name\":\"Daily lead Pakistan\",\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/logo3.jpg\",\"contentUrl\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/logo3.jpg\",\"width\":1000,\"height\":154,\"caption\":\"Daily lead Pakistan\"},\"image\":{\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DailyLeadPak\\\/\",\"https:\\\/\\\/x.com\\\/DailyLeadPak\",\"https:\\\/\\\/instagram.com\\\/DailyLeadPak\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/#\\\/schema\\\/person\\\/6ef8309590ff620a99ce35559f54fd62\",\"name\":\"Web Desk\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g\",\"caption\":\"Web Desk\"},\"url\":\"https:\\\/\\\/leadpakistan.com.pk\\\/news\\\/author\\\/edt\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Water enters Tarbela powerhouse after rockfall","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/","og_locale":"en_US","og_type":"article","og_title":"Water enters Tarbela powerhouse after rockfall","og_description":"Wapda says main tunnel, tail race culvert and switchyard remain undamaged HARIPUR A breach in a protective bund at the Tarbela Dam\u2019s T-5 hydropower project on Monday caused a large volume of water to flood Tunnel Five, prompting the suspension of construction work indefinitely, officials said. According to a statement issued by the Water and [&hellip;]","og_url":"https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/","og_site_name":"Daily Lead Pakistan","article_publisher":"https:\/\/www.facebook.com\/DailyLeadPak\/","article_published_time":"2026-11-10T01:30:14+00:00","og_image":[{"width":1707,"height":990,"url":"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2026\/11\/Front-Pesha-5.jpg","type":"image\/jpeg"}],"author":"Web Desk","twitter_card":"summary_large_image","twitter_creator":"@DailyLeadPak","twitter_site":"@DailyLeadPak","twitter_misc":{"Written by":"Web Desk","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/#article","isPartOf":{"@id":"https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/"},"author":{"name":"Web Desk","@id":"https:\/\/leadpakistan.com.pk\/news\/#\/schema\/person\/6ef8309590ff620a99ce35559f54fd62"},"headline":"Water enters Tarbela powerhouse after rockfall","datePublished":"2026-11-10T01:30:14+00:00","mainEntityOfPage":{"@id":"https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/"},"wordCount":547,"publisher":{"@id":"https:\/\/leadpakistan.com.pk\/news\/#organization"},"image":{"@id":"https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/#primaryimage"},"thumbnailUrl":"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2026\/11\/Front-Pesha-5.jpg","articleSection":["Top News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/","url":"https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/","name":"Water enters Tarbela powerhouse after rockfall","isPartOf":{"@id":"https:\/\/leadpakistan.com.pk\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/#primaryimage"},"image":{"@id":"https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/#primaryimage"},"thumbnailUrl":"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2026\/11\/Front-Pesha-5.jpg","datePublished":"2026-11-10T01:30:14+00:00","breadcrumb":{"@id":"https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/#primaryimage","url":"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2026\/11\/Front-Pesha-5.jpg","contentUrl":"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2026\/11\/Front-Pesha-5.jpg","width":1707,"height":990},{"@type":"BreadcrumbList","@id":"https:\/\/leadpakistan.com.pk\/news\/water-enters-tarbela-powerhouse-after-rockfall\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/leadpakistan.com.pk\/news\/"},{"@type":"ListItem","position":2,"name":"Water enters Tarbela powerhouse after rockfall"}]},{"@type":"WebSite","@id":"https:\/\/leadpakistan.com.pk\/news\/#website","url":"https:\/\/leadpakistan.com.pk\/news\/","name":"Daily Lead Pakistan","description":"Daily Lead Pakistan","publisher":{"@id":"https:\/\/leadpakistan.com.pk\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/leadpakistan.com.pk\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/leadpakistan.com.pk\/news\/#organization","name":"Daily lead Pakistan","url":"https:\/\/leadpakistan.com.pk\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/leadpakistan.com.pk\/news\/#\/schema\/logo\/image\/","url":"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2022\/04\/logo3.jpg","contentUrl":"https:\/\/leadpakistan.com.pk\/news\/wp-content\/uploads\/2022\/04\/logo3.jpg","width":1000,"height":154,"caption":"Daily lead Pakistan"},"image":{"@id":"https:\/\/leadpakistan.com.pk\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DailyLeadPak\/","https:\/\/x.com\/DailyLeadPak","https:\/\/instagram.com\/DailyLeadPak\/"]},{"@type":"Person","@id":"https:\/\/leadpakistan.com.pk\/news\/#\/schema\/person\/6ef8309590ff620a99ce35559f54fd62","name":"Web Desk","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/41f05ebf0a510062a26cf1d9e662155a6901c6733aa66a6c0f61daea3d680dc7?s=96&d=mm&r=g","caption":"Web Desk"},"url":"https:\/\/leadpakistan.com.pk\/news\/author\/edt\/"}]}},"_links":{"self":[{"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/posts\/576791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/comments?post=576791"}],"version-history":[{"count":1,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/posts\/576791\/revisions"}],"predecessor-version":[{"id":576836,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/posts\/576791\/revisions\/576836"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/media\/576803"}],"wp:attachment":[{"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/media?parent=576791"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/categories?post=576791"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/leadpakistan.com.pk\/news\/wp-json\/wp\/v2\/tags?post=576791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}