Home Peshawar Loadshedding in Astore can be curtailed through saving: XEN

Loadshedding in Astore can be curtailed through saving: XEN

0
141

ASTORE: Executive Engineer Water and Power Karim Khan has said load shedding in district Astore cold be ended if the peopl cooperate with the electricity department. Talking to media men here he said that loadshadding can be decreased only with the cooperation of the local people. In Summer the water level increased in water channels and the production of electricity increased in power houses. Full time electricity can be provided to the district if the people try to save electricity. He said that the people should not use heavy electric equipment such as Geyzers, heaters and other electronic machines in their houses. He appealed the people of Astore to cooperate with the government and the department against the people using illegal connections. APP