PM calls for tapping coal, wind & solar energy potential of country

0
171

KARACHI
Prime Minister Muhammad Shehbaz Sharif inaugurated K-3, the third unit of Karachi Nuclear Power Plant in Karachi today which will produce 1,100 megawatts of electricity. The project has been completed with assistance of China.
PM stressed the need of fully tapping coal, wind and solar energy potential of the country to meet energy demand and reducing dependency on imported fuel for energy purpose.

He said K-3 is a step forward in cooperation with Pakistan’s trusted friend China. He also congratulated the scientists and workers of Pakistan and China which led to the completion of the project.
He said the staff of the Pakistan Atomic Energy Commission who contributed to the project would be invited to the Prime Minister’s Office for public recognition.
The Prime Minister said in view of 27 billion dollars energy import bill, Pakistan requires alternative and cheaper sources of energy including solar, wind, hydel and nuclear. He said Pakistan is gifted with enormous resources with the potential of producing 60,000 megawatts through hydel power.
He recalled that the project of KANUP was finalized during the tenure of then prime minister Nawaz Sharif and expressed gratitude to the government of China for extending cooperation in this regard.
Shehbaz Sharif mentioned that the electricity projects under the China-Pakistan Economic Corridor were greatly contributing to the country’s energy demands through the production of thousands of megawatts.
Director General International Atomic Energy Agency (IAEA) Rafael Mariano Grossi in a video message emphasized the importance of using safe use of nuclear energy as Pakistan faced challenges of climate change.
Chairman Pakistan Atomic Energy Commission Raja Ali Raza Anwar said National Electric Power Regulatory Authority had declared KANUP as a high power producing facility with its 27.15 percent production.